Note: If the Start Date for tab 3 is equal to 06/04/XX or 07/04/XX, follow the steps below:
1. Delete the GMP Earnings factor tab (the first tab)
2. Change the dates for the subsequent tabs
This modification is done to ensure the correct dates are used for the Revaluation and GMP interest calculations
Tab 2 becomes tab 1:
From date |
This should be set as the Contracted Out end date - 1 day |
To date |
This should be set as the Contracted Out end date |
|
|
|
|
|
|
|
|
Related Topics